Skip to main content
TaktaScheduling software

00Production scheduling/ Custom fabrication / Job shops

In development

Know which delivery date you can keep, before you quote it.

Takta is scheduling software for shops that build to order. It takes your routings, the hours your work centers actually have, and when material lands, and it returns the earliest date the job can finish.

Status
In development. Not generally available, and not sold yet.
Who it's for
Owners and schedulers in job-shop fabrication.

Diagram: planned scheduling behaviour

Center
12345678910

Laser

LC-01

41764181

Press brake

PB-02

41764181

Weld

WD-01

41764181

Finish

FN-01

41764181

Ship

SH

41764181

Four jobs routed across five work centers. Every operation sits inside the capacity its center actually has.

ResultJob 4181 ships day 9, and the schedule has 1 day of slack before it.

Illustrative diagram of the scheduling behaviour Takta is being built to produce. Job numbers, work centers and days are examples written for this page, not customer data, and not a screenshot of shipping software. Solid = running, hatched = waiting on material, red = center unavailable.

01Why dates slip

Most shops don't lose the date on the floor. They lose it at the quote.

  1. 01

    The date is promised before anyone checks the brake

    A job gets quoted with a delivery date from memory. Nobody looks at what the press brake or the weld bay is already carrying that week, because that information lives on a whiteboard that was accurate on Monday.

  2. 02

    One late plate quietly moves nine jobs

    Material slips three days. The operations behind it slide, but nothing tells the person answering the phone which customers are now affected, so everyone finds out at the end of the week.

  3. 03

    Rescheduling means rewriting the board

    When a machine goes down, the schedule is re-derived by hand. It takes a morning, so it happens rarely, and the printed traveller on the floor stops matching reality.

These are the problems we heard while scoping Takta with people who run fabrication shops. We are not publishing counts, names or survey figures for those conversations.

02Mechanism

Four inputs, one derived schedule.

  1. Routing, in shop terms

    A job is a sequence of operations across named work centers such as laser, brake, weld and finish, each with a setup time and a run rate you set once per center.

  2. Capacity, not wishful hours

    Each work center has real available hours: shifts, how many machines, planned maintenance. Operations are only placed into hours that exist.

  3. Material as a gate

    An operation cannot start before its material is on site. Expected arrival dates hold the operation instead of silently consuming machine time.

  4. A date you can defend

    The earliest completion the routing and capacity allow, with the slack shown. Change an input and the schedule re-derives, with no rewriting of the board.

Read the scheduling method in detail →

03Shop types

04Build scope

What exists, what is specified, what isn't promised.

Routing and work-center model

In development

Operations, work centers, setup and run rates, shift calendars. This is the part we are writing now.

Capacity-aware date calculation

In development

Earliest completion from routing plus available hours, with slack shown against the requested date.

Material arrival gating

Specified, not built

Expected-arrival dates that hold an operation instead of consuming machine hours. Designed, not yet written.

Floor day view

Specified, not built

A per-center list of what to run next, readable on a shop tablet. Designed, not yet written.

Accounting, ERP and MRP integrations

Later, not committed

Nothing is connected today. We will only list an integration here once it works end to end.

Anything with a customer login

Later, not committed

There is no Takta application to sign into on this site, and no portal. When there is, it will be behind a real account.

Early access

We'd rather build this against your routings than our assumptions.

Tell us what you fabricate and how your schedule is kept today. If your shop pattern matches what we are building, we'll come back to you when the first release is ready to try.

  • Name, email and shop name are all that is required.
  • One reply from us. No sequence, no newsletter.
  • No launch date, waitlist position or headcount is claimed anywhere on this site.