Counting bays overstates your capacity. Count covered hours.

Weld work is limited by who is on the floor and what they are cleared to run. Scheduling by equipment count promises hours that no one is standing in, and the shortfall only becomes visible in the last week of a job.

Governing constraint

A bay is capacity only while a welder qualified for that procedure is in it, and long weld operations cannot be sliced across two people mid-seam.

Diagram: bays vs. covered hours

Bay 1

5 available hours

Bay 2

Half shift covered

Bay 3

No welder assigned

Three bays, and nine hours of weld capacity rather than twenty-four.

Illustrative capacity sketch drawn for this page. Bay names and hours are examples, not customer data.

01What changes here

What this work does to a schedule.

  • Capacity follows the person

    Available hours per bay come from who is rostered, not from how many bays exist. When someone is out, the schedule should lose exactly those hours and nothing else.

  • Fit-up is a separate operation with a different rate

    Tacking and squaring an assembly is not welding, takes different time, and often blocks the bay before any weld hours are consumed. Treating fit-up as its own operation stops the weld estimate from absorbing it.

  • Procedure restrictions narrow the eligible pool

    Some work can only be run by welders cleared for the relevant procedure. That turns a general queue into several narrow ones, and the narrow ones are usually the bottleneck.

  • Long operations are indivisible

    A twelve-hour weld does not become two six-hour jobs on different days without cost. The schedule has to place it as one block, which makes end-of-shift boundaries part of the date.

02What Takta models

Handled for weld fabrication work.

In development

Labour-based work-center hours

Available hours entered per center and shift, so weld capacity reflects coverage rather than equipment count.

In development

Fit-up and weld as distinct operations

Separate operations with their own setup and run figures inside one job routing.

Specified, not built

Indivisible operation blocks

Operations placed whole, so a long weld is scheduled where it genuinely fits instead of being split silently.

Specified, not built

Eligibility-restricted work centers

A center that only some of the roster can staff, narrowing available hours for the operations that require it.

Not planned for the first release

Welder certification records

Takta will not be a system of record for qualifications, expiry tracking or procedure documents.

Not planned for the first release

Weld inspection or NDT results

No inspection results, traceability packages or test reporting are part of this product.

Not covered

  • No payroll, time clock or labour cost accounting.
  • No certification, qualification or compliance record keeping.
  • No quality, inspection or traceability documentation.