Counting bays overstates your capacity. Count covered hours.
Weld work is limited by who is on the floor and what they are cleared to run. Scheduling by equipment count promises hours that no one is standing in, and the shortfall only becomes visible in the last week of a job.
Governing constraint
A bay is capacity only while a welder qualified for that procedure is in it, and long weld operations cannot be sliced across two people mid-seam.
Diagram: bays vs. covered hours
Bay 1
5 available hours
Bay 2
Half shift covered
Bay 3
No welder assigned
Three bays, and nine hours of weld capacity rather than twenty-four.
Illustrative capacity sketch drawn for this page. Bay names and hours are examples, not customer data.
01What changes here
What this work does to a schedule.
Capacity follows the person
Available hours per bay come from who is rostered, not from how many bays exist. When someone is out, the schedule should lose exactly those hours and nothing else.
Fit-up is a separate operation with a different rate
Tacking and squaring an assembly is not welding, takes different time, and often blocks the bay before any weld hours are consumed. Treating fit-up as its own operation stops the weld estimate from absorbing it.
Procedure restrictions narrow the eligible pool
Some work can only be run by welders cleared for the relevant procedure. That turns a general queue into several narrow ones, and the narrow ones are usually the bottleneck.
Long operations are indivisible
A twelve-hour weld does not become two six-hour jobs on different days without cost. The schedule has to place it as one block, which makes end-of-shift boundaries part of the date.
02What Takta models
Handled for weld fabrication work.
In development
Labour-based work-center hours
Available hours entered per center and shift, so weld capacity reflects coverage rather than equipment count.
In development
Fit-up and weld as distinct operations
Separate operations with their own setup and run figures inside one job routing.
Specified, not built
Indivisible operation blocks
Operations placed whole, so a long weld is scheduled where it genuinely fits instead of being split silently.
Specified, not built
Eligibility-restricted work centers
A center that only some of the roster can staff, narrowing available hours for the operations that require it.
Not planned for the first release
Welder certification records
Takta will not be a system of record for qualifications, expiry tracking or procedure documents.
Not planned for the first release
Weld inspection or NDT results
No inspection results, traceability packages or test reporting are part of this product.
Not covered
- No payroll, time clock or labour cost accounting.
- No certification, qualification or compliance record keeping.
- No quality, inspection or traceability documentation.
03Next
If this is your shop, we want your routings in front of us.
Early access is a conversation about how you schedule today, followed by an invitation to try the first release when it can genuinely help.